• crhotsprings

Annual Maintenance at Radium Hot Springs

From April 25, 2022 until May 6, 2022, water from the hot springs will be diverted into the swimming pool (known locally as the “cool pool”).


During this time, the shallow soaking pool (known locally as the “hot pool”) will be closed while annual maintenance is completed.


A limited number of benches will be hung off the side of the swimming pool while it is filled with hot springs water. Pool noodles will also be available for use should you wish to float in the swimming pool.


The water in the swimming pool will be kept between 37 and 40 degrees Celsius or 98 and 104 Fahrenheit during this time.

2,641 views0 comments

Recent Posts

See All

Radium Hot Springs will switch to summer hours of operation on Friday, May 20th. Scheduled hours of operation for the hot and cool pools are: 11:30 a.m. to 9 p.m. Monday to Friday, 10:30 a.m. to 9 p.m

Radium Hot Springs will switch to summer hours of operation on Friday, May 20th. Scheduled hours of operation for the hot and cool pools are: 11:30 a.m. to 9 p.m. Monday to Friday. 10:30 a.m. to 9 p.m

Miette Hot Springs will reopen at noon on May 6, 2022. Hours of operation are 12 p.m. to 8 p.m. daily. Last entry is at 7:30 p.m.